Comprehensive DPC project at Expert Timing

Background and challenges

The DPC requested by a client such as Expert Training was a complex equipment that had to have vast computing capacity to carry out massive amounts of complex operations and calculations. GESAB intervened at the necessity to update the DPC guaranteeing service continuity and providing a personalized attractive look for the visitors of the Data Processing Center.

Solution

We finally opted for the closure of cold and warm aisles in the DPC, using the GESAB CCNOC system, integrating the climate control in the aisle though In Row units. We also decided to use a fake floor with transparent tiles to show the wiring connecting the different pieces of equipment, complemented by led lighting inside the aisles. Moreover, GESAB integrated a unique alarm system.

Benefits

From the very beginning, the work was carried out by GESAB in close collaboration with the client, which allowed for the construction of a project completely customized to their technical and cosmetic needs. The project developed by GESAB for Expert Timing constitutes and example for the DPC industry regarding how design and functionality can come together to provide great performance and successful show business.

Client: Expert Timing
Country: Spain
Sector: Finances
About Expert Timing: Expert Timing is a company that offers counseling and projections regarding investment products based on the study of algorithms and the most advanced technology. In their client portfolio, financial institutions occupy a very important place.
Potencia: 180 KVA
Espacio: 550 m2
Nivel: 2 N

Data sheet

Action

Development and execution of a comprehensive DPC project where technical needs, cutting-edge technology and a unique design and finish converge on a customized security system.

Products

Interior design, CCNOC