Background and challenges
Verallia was able to see the work of GESAB through its website. Professionalism, good work and teamwork in the initial phases made possible the development of this project.
Verallia needed a control centre to manage its main glass container production. A space prepared to efficiently control and supervise processes for Europe’s largest glass furnace.

Solution
GESAB proposed an ergonomic solution tailored to the client. A project was developed for four operators based on the Advantis NG console. Tailor-made technical furniture customised with the Verallia logo backlit on the side cover of the consoles. In addition, the project included the implementation of KVM systems for operator positions. The room was completed with an auxiliary furniture, also custom-designed for the client.
Benefits
Verallia now has a control centre with the latest technology systems. A space where it can control all its production efficiently and completely customised and adapted to its needs.
