GESAB joins the spanish “Silicon Alley”
GESAB Group has offices in Barcelona, Madrid and Mexico City. Madrid headquarters are located in the district of San Blas. This area of the Spanish capital is known as the Silicon Alley, in the image and likeness of New Yorks district, which co[…]

GESAB takes part in the command center of Mecca
The Saudi General Director of Civil Defence, Saad bin Abdullah Al-Tuwaijri, recently inaugurated the Mecca wireless communications control room. This is a facility that ensures the safety of hundreds of thousands of Muslim pilgrims who flock every ye[…]

GESAB has something that will surprise you (chapter 5)
Fusion, bonding, amalgam, synergy. Every synonym is good, if we can get different materials and technologies work together to deliver optimal performance. GESAB Group has over 20 years building materials studies, ergonomic designs and configuration[…]

GESAB has something that will surprise you (chapter 4)
Safety and risk prevention comes first. Before addressing issues of efficiency and effectiveness in day to day, we must ensure that persons working in an area are safe and that continued use of the workplace will not undermine their welfare. Lets t[…]

GESAB has something that will surprise you (chapter 3)
Let the air flow. Let the equipments to have the flow they need to deliver maximum performance. We seek to achieve efficiency and effectiveness. They are not the same and must be supplemented:
Efficiency in general describes the extent to which tim[…]

GESAB has something that will surprise you (chapter 2)
The seamless connection and communication among technologies encourages adaptation. GESAB designs and develops products and solutions adapted to the reality of the needs not only of the workplace but also of the people that make it work. The iPhone, […]

GESAB has something that will surprise you (Chapter 1)
The perfect works are the result of time you invest on it. Based on that phrase, much used by the CEO of GESAB, Pere Sabaté, and leitmotif of the human team of the company, began a process of more than two years of work. A development that is ne[…]

International case study: 14 control consoles for the United Nations
GESAB solutions for control centers were chosen by the United Nations to equip its logistics base in Quart de Poblet, Valencia. United Nations had the need to enable 14 operator desks, with a control console, ergonomic chairs and supports for monitor[…]

International case study: Montepío of Portugal
The Montepio of Portugal had the need to renew their trading room, a place where 8 operators should be aware of a significant flow of economic information.
The challenge for the GESAB team was to devise a configuration favoring the ergonomics […]

Control console ADVANTIS, in the Reims tram (France)
ADVANTIS control console designed and manufactured by GESAB, shines as a fully configurable solution , modular, to fit any need for 24x7x365 operations centers. In the Reims tram (France) Alstom Italy and GESABs Italian partner ElPack thoughtADVA[…]

